AREN
Jeddah - Al Aziziyah - 60th Street - Al Malika Commercial Administrative Center05997782860508163591
AREN

Cleaner air and measured flow

Central Ventilation Fan Systems

Design and implementation of air intake,expulsion and supply systems according to the flow and pressure rates required for each space and activity.

Central fan system for ventilation

Ventilation solutions that suit the nature of the facility

We determine the renewed air need,intake rates,and pressure,then choose the fan type,capacity,duct path,and control methods. Applications include ventilation of parking lots,kitchens,restrooms,warehouses,factories and service rooms.

We take into account the level of noise,energy consumption,and ease of access for maintenance. We also coordinate the system with the requirements of fire,air conditioning,and other services.

Suction of smoke and gases

Mission-designed smoke extraction systems help remove smoke and hot air from specific areas,improving visibility and evacuation routes based on the approved operating scenario.

Supporting fire safety systems

Smoke extraction fans and pressure on stairs and corridors are integrated with fire systems to control the movement of smoke and limit its spread between areas within the approved design.

Fresh Air

Supply fans provide measured outside air to compensate for drawn air,improve indoor air quality,and maintain pressure balance within the facility.

Safety Note:Smoke extraction,staircase pressure,and fire systems must be designed,implemented,and tested in accordance with the project code,requirements of civil defense,and the competent authorities,and using equipment classified for the application when required.

What do we offer?

  • Calculate air exchange rates
  • Selection of fans and capacities
  • Intake and expulsion systems
  • Compression and air supply systems
  • Control and operation
  • Test flow and trends

Requirements required

  • Architectural plans
  • Type of activity and use
  • Sizes and areas of areas
  • Civil defense requirements
  • Evacuation sites and fresh air
  • Operating hours

Implementation steps

  1. Need studyDetermine the amounts of air and pressure required.
  2. Choose the systemSpecifying fans,ducts and control.
  3. InstallationImplementing equipment,paths and connections.
  4. Testing and balancingFlow measurement and performance tuning.

Technical scope

We design and execute central ventilation fan systems for exhaust,fresh air,smoke extraction,central kitchens and parking ventilation,considering airflow rates,pressure and operational safety.

  • Exhaust and fresh air fan selection
  • Duct connection and control integration
  • Smoke extraction and kitchen ventilation solutions
  • Airflow balancing after commissioning
fresh air and exhaust fanscommercial kitchen ventilationpositive and negative pressure systems

Target sectors

This service supports facilities that need reliable cooling,ventilation or refrigeration performance with clear documentation and practical maintainability.

Central kitchens and restaurantsBasement parking areasFactories and workshopsHospitals and public buildings

Why choose New alfouz AC CO.?

Understanding of fresh air and pressure requirementsSolutions that reduce odors,heat and smokeCoordination with life-safety systems when neededExecution suitable for long operating hours

Related HVAC services

These internal links help visitors and search engines understand the relationship between engineering,execution and maintenance services.

Frequently asked questions

How do you determine fan power?

Depending on the required air quantity,static pressure,duct resistance,filters and accessories.

Is kitchen ventilation different from parking?

Yes,each application has different air,equipment,safety and treatment rates.

Does the service include air testing?

Yes,flow can be measured and outlets and fans can be adjusted to reach design values.

Ask to study the ventilation system

Send plans,activity type and project location.

Contact Us on WhatsApp