AREN
Jeddah - Al Aziziyah - 60th Street - Al Malika Commercial Administrative Center05997782860508163591
AREN

Integrated air conditioning solutions for projects

Central Air-Conditioning System Installation

We start by calculating the loads and choosing the most suitable system,then we undertake the supply,installation,testing and commissioning to achieve stable thermal comfort and better energy efficiency.

Implementation and installation of a central air conditioning system

Central air conditioning installation service from start to operation

New alfouz AC CO. provides engineering solutions for central air conditioning systems suitable for villas,administrative buildings,restaurants,factories and commercial establishments. Our team reviews the nature of use,spaces and heat sources,then determines the capacity,system,air paths and ducts before starting implementation.

We implement package systems,duct splitters,VRFs,and central systems according to project requirements and approved plans,paying attention to ease of maintenance,reducing noise,and improving air distribution.

We provide air conditioning signs according to project requirements

We help you choose the appropriate brand,model,and capacity according to design,specifications,and energy efficiency.

Brands and models are subject to availability,project requirements and approved specifications.

The air conditioning systems we implement and the advantages of each system

We choose the system after studying the loads,the nature of the building,operating hours,and the budget,because each system has strengths and appropriate uses.

Chiller air system for central air conditioning
Central Chiller

Chiller system

A central system that produces chilled water and distributes it to air handling units or fan coil units,suitable for projects with large loads and extended operation.

  • Good efficiency for large projects
  • Flexibility in load distribution
  • Possibility of controlling areas
  • Long operating life with maintenance
  • Suitable for the planned expansions
  • Centralized monitoring of performance
Mostly fits:Hospitals,complexes,malls,hotels,factories and large buildings.
VRF air conditioning system diagram
Variable Refrigerant Flow

VRF system

It connects several indoor units to an outdoor unit or group of units,and changes the refrigerant flow according to the needs of each area to achieve flexible control.

  • Independent control of the zones
  • Efficiency in partial loads
  • Reduce duct space
  • Quiet operation inside the building
  • Flexibility in choosing indoor units
  • Advanced control and monitoring
Mostly fits:Hotels,offices,villas,and multi-use buildings.
Package air conditioning unit
Packaged Unit

Package system

An integrated unit that includes the cooling components in one external device,and is connected to the location via a duct network to supply large quantities of air to the spaces.

  • High cooling capabilities
  • Direct installation and operation
  • Easy access for maintenance
  • Suitable for open spaces
  • Reduce equipment inside the building
  • A practical solution for commercial projects
Mostly fits:Restaurants,halls,mosques,warehouses,exhibitions and commercial buildings.
Concealed ducted split air conditioning unit
Concealed Duct Split

Split duct system

A hidden indoor unit above the ceiling connects to an outdoor unit and distributes air through ducts and vents,a popular solution for medium residential and commercial spaces.

  • Elegant and discreet interior appearance
  • Air distribution to several outlets
  • Wide availability of parts and maintenance
  • Balanced establishment cost
  • Suitable for villas and offices
  • Possibility of adding zone control
Mostly fits:Villas,large apartments,offices,clinics,and medium-sized stores.

Additional forms and air conditioning units

Air condensing unit
Air condensing unit
Wall split air conditioner
Wall split air conditioner
Ceiling cassette air conditioner
Ceiling cassette air conditioner
Floor standing air conditioner
Cupboard air conditioner

What does the service include?

  • Calculating thermal loads
  • Choose the appropriate system and capacities
  • Supply of equipment and units
  • Implementation of ducts,pipes and insulation
  • Tests and initial commissioning
  • Delivering reports and instructions

Requirements for starting a project study

  • Architectural plans of the building
  • Project location and usage area
  • Type of activity and number of users
  • Internal loads and equipment
  • Budget or specifications required
  • Expected schedule

Implementation stages

  1. Inspection and studyCollect site data and calculate actual need.
  2. Design and technical presentationDetermine the system,equipment,routes and cost.
  3. Supply and implementationImplementing works according to plans and specifications.
  4. Testing and deliveryCheck performance,system operation and project delivery.

Technical scope

We deliver central air conditioning installation in Jeddah and Saudi Arabia for commercial,residential and industrial projects,selecting chilled water,VRF,package and duct split systems according to building load,operating hours and budget.

  • Cooling load review and equipment sizing
  • Supply and installation of central HVAC equipment
  • Ductwork,copper piping or chilled water piping works
  • Testing,commissioning and handover notes
central HVAC installation JeddahHVAC contractor Saudi Arabiacommercial air conditioning

Target sectors

This service supports facilities that need reliable cooling,ventilation or refrigeration performance with clear documentation and practical maintainability.

Malls and retail centersHotels and office buildingsHospitals and medical centersFactories and telecom rooms

Why choose New alfouz AC CO.?

System selection based on project needs,not a generic unitEngineering coordination with ducts,power and civil worksExecution that supports energy efficiency and maintainabilityExperience in central HVAC projects in Jeddah and Saudi Arabia

Related HVAC services

These internal links help visitors and search engines understand the relationship between engineering,execution and maintenance services.

Frequently asked questions

How to choose the appropriate air conditioning capacity?

Capacity is based on calculating thermal loads and not area alone,and includes building orientations,insulation,glazing,number of users and equipment.

Do you implement projects outside Jeddah?

Yes,we implement air conditioning and refrigeration projects in various cities in the Kingdom of Saudi Arabia.

Does the service include maintenance after installation?

A preventive maintenance program can be prepared that suits the type of system and the nature of facility operation.

Do you have a central air conditioning project?

Send drawings and project information for preliminary study and suitable offer.

Contact Us on WhatsApp